8-story mixed-use
Austin, TX
Full structural + misc detailing, connection design, and joist/deck coordination on a compressed fast-track schedule.
- Tons detailed
- 1,240
- Drawings issued
- 610
- Connections designed
- 380
- Schedule saved
- 3 weeks
CALDIM ENGINEERING SERVICES · STRUCTURAL STEEL
Every member modelled, every bolt checked, every drawing issued ready for the shop floor.
Assembling steel platform.
STRUCTURAL STEEL DETAILING · CONNECTION DESIGN
Shop drawings, PE-stamped connections, and fast estimates for fabricators and EPCs who can't afford a bad RFI rate. AISC and CISC compliant, from RFQ to erection.

BY THE NUMBERS
PE-STAMPED IN ALL 50 STATES · AISC MEMBER · 150+ EMPLOYEES · 48,000+ TONS DETAILED
CAPABILITIES

Tonnage takeoffs and connection-count estimates from bid-set or IFC drawings, turned around fast enough to make your bid deadline.

Shop and erection drawings built for the field, not just for approval. Advance bills that let your shop cut before the model is even finished.

Stairs, rails, ladders, and platforms are where most RFIs live. We detail them to walk-through accuracy on the first issue.

Delegated connection design, calculated and stamped by licensed PEs in all 50 states — moment, shear, bracing, and base plate.

SJI-compliant joist layouts and joist girder detailing, coordinated with metal deck placement before steel ever leaves the shop.

Custom scripts, templates, and Tekla PowerFab pipelines that take the repetitive work out of your detailing and push clean data straight into the shop.
SIGNATURE CAPABILITY
Most detailers hand you a connection and let your EOR figure out if it works. We calculate it ourselves — moment, shear, bracing, and base plate — per AISC 360-22, and put a stamped seal on the package before it leaves our shop.
COVERAGE
50-state PE
DESIGN BASIS
AISC 360-22
TURNAROUND
5–8 business days
CALC PACKAGE — SAMPLE
Moment Connection Design — Grid B/3
PROJECT
2026-0148
Mu
184 kip-ft
φMn
221 kip-ft
Bolt group
(8) 7/8" A325-SC
Ratio
0.83 OK
SEALED
Sample — for illustration only
PROCESS
Send drawings, tonnage, and timeline. We return a fixed-fee quote and start date — usually within 2 business days.
Phase 1 of 6Tekla or SDS/2 model set up from IFC, DWG, or PDF contract documents, grids and levels matched to the EOR set.
Phase 2 of 6Shop and erection drawings, advance bills, and connection layouts drafted against your fabricator standards.
Phase 3 of 6A second detailer, not the modeler, checks every sheet against the contract documents before it leaves our shop.
Phase 4 of 6Delegated connections calculated per AISC 360-22 and stamped by a licensed PE in the project's state of record.
Phase 5 of 6Final package issued in your preferred format, with RFI turnaround support through erection.
Phase 6 of 6SELECTED PROJECTS
Austin, TX
Full structural + misc detailing, connection design, and joist/deck coordination on a compressed fast-track schedule.
Joliet, IL
Long-span joist girder roof system detailed alongside base plate and bracing connection design for a single steel package.
Vancouver, BC
CISC-compliant detailing with egress stair and guardrail packages carried through to erection support.
GALLERY





TOOLS OF RECORD
Industry-standard tools powering accurate structural steel detailing and engineering.




Code compliance and strict drafting protocols across US and Canadian jurisdictions.
CERTIFICATIONS
EVENTS
San Antonio, TX
Booth visit — connection design and detailing capability walkthroughs.
Regional fabricator shops, US
Site visits with fabricator partners to review current detailing workflows.
Online
Live walkthrough of our RFQ-to-issued-for-fab process for prospective clients.
WHY CALDIM
RFI rate < 0.8%
Every sheet passes an independent check against contract documents before issue — not a self-check by the modeler.
Avg. 8-day turnaround
Fixed-fee quotes with committed dates. Advance bills issued early so your shop isn't waiting on the full package.
50-state PE stamping
Licensed structural engineers stamp connection calcs in every US state, so multi-state projects run through one team.
1 dedicated PM per project
A dedicated project manager with 15+ years in Tekla and SDS/2 is assigned to every job — one point of contact from RFQ to RFI close-out, not a shared inbox.
MEET OUR LEADERSHIP
Every package leaves here under a named engineer, not a queue. These are the people accountable for the drawings, the calculations, and the dates we commit to.
01Chief Technical Adviser
02Director
03President
04General Manager
YOUR PROJECT TEAM
Project Manager — Tekla & SDS/2
15+ years
Dedicated Tekla and SDS/2 PM. Every project is assigned its own PM, start to finish.
Principal, Connections Design
PE, SE
20+ years stamping delegated connections across the US and Canada.
Detailing Manager
Tekla Certified
Runs QC on every structural and misc. steel package before issue.
Estimating Lead
Tekla / SDS-2
Owns takeoffs and budget pricing, from bid-set to fixed-fee quote.
Joist & Deck Lead
SJI-familiar
Coordinates joist girder and deck layouts with steel and precast trades.
CAREERS
We're a detailing and connection-design team split between Hosur and Chennai, growing steadily as our client list does. If you've got Tekla, SDS/2, or PE-stamp experience, we'd like to hear from you.
Send Your ResumeCURRENT FOCUS AREAS
CLIENT FEEDBACK
“[Placeholder — fabricator quote on turnaround and RFI rate to go here.]”
“[Placeholder — GC quote on connection design coverage across states to go here.]”
“[Placeholder — EOR quote on calc package quality to go here.]”
CONTACT
Registered Office — Hosur
CALDIM Engineering Pvt. Ltd. Plot No. 22, 23, 24, 2nd Floor, Durga Bhavani Towers, Near RTO Check Post, NH 207, Bagalur Road, Hosur – 635103, Tamil Nadu, India
Corporate Office — Chennai
Minmac Center #118, First Floor, Arcot Road, Valasaravalakkam, Chennai – 600087, Tamil Nadu, India
DIRECT CONTACTS